Betara Complex Expansion Project

After successfully delivering units to MHPS for the XTTK project in Tanzania, MHPS has entrusted Ecodyne Heat Exchangers with delivering a further air-cooled heat exchanger (ACHE). The ACHE will cool an H25(28) gas turbine that will be installed as part of an upgrade of the Betara complex in Indonesia. The Betara Complex is operated by Petrochina International Jabung, Ltd.

"MHPS was very satisfied with Ecodyne's execution of the XTTK project (in Tanzania) and consequently have selected Ecodyne to deliver an ACHE for the expansion of the Betara Complex in Indonesia." said Alexander Luft, Head of Sales & Marketing at Ecodyne Heat Exchangers.

Client Mitsubishi Hitachi Power Systems
Location(s): Betara, Indonesia
Capacity: 41 MW
Plant: 1x H25(28)
Order: 2017/Q1
Hardware: ECO-TAC Air Cooled Heat Exchangers for closed circuit water cooling with steel structure, handrail and ladders, interconnecting piping and instrumentation.
Services: Project Management, Quality Assurance, Engineering, Procurement, Manufacturing, Factory Testing, Documentation including KKS Numbering
By: Trent Crawford